What is this opportunity?
This Tender process concerns a contract for a Mechanical Planned and Reactive Maintenance, Service and Repair Service for the Police and Crime Commissioner for South Wales (the "Commissioner"). The Contract is divided into 3 Lots as shown below and further set out in the Specification. One Contractor shall be appointed to each of Lots 1 to 3. Tenderers may bid for single lots, multiple lots or all lots. LOT 1 - The maintenance, service, repair and replacement parts for heating and plumbing systems LOT 2 -The maintenance, service, repair and replacement parts for local extraction 50and ventilation systems including local exhaust ventilation (LEV) and room extraction and fire and smoke dampers LOT 3 - Heating, ventilating and air conditioning systems ("HVAC's") and Air handling Units (AHU's) The detail of each of the Services required under each lot can be located within the Specification within the Tender Document, which can be located within the General Attachments Area of https://etenderwales.ukp.app.jaggaer.com, along with all of the other Tender Documents.
Summary and deadlines come from the named official feed. Always confirm amendments, timezone, supplier eligibility, and submission requirements directly with the issuing organisation.
Original notice and documents
Browsing the original government notice and obtaining publicly available bidding documents from the issuing authority remain free. Some buyer portals require their own supplier registration.
- Issuing organisation
- Police and Crime Commissioner for South Wales
- Official source
- UK Find a Tender
- Notice identifier
- ocds-h6vhtk-0519f2
- Source document files verified for compilation
- Not yet available
Preview the ZIP tender briefing
The free sample ZIP includes a source-attributed notice summary, a bidding checklist and a source-link manifest. It does not contain the buyer's complete bidding attachments.
Download sample ZIPPack content is not official advice and is not a bid submission. Full document ZIPs are provided only when official files are verified, reusable and complete; paid checkout remains disabled until payment acceptance passes.