What is this opportunity?
Kingsteignton Town Council invites competitive tenders from suitably qualified and experienced specialist contractors for the design and construction of a new asphalt pump track at Clifford Park, Kingsteignton, Devon. Pump Track Specification 1. Site Preparation Measure and mark out the area associated with the pump track. 2. Topsoil Topsoil to be set aside for the dressing of the berms etc. 3. Drainage 80mm dia PVC coil pipe to be laid centrally in the trench, covered with a geotextile membrane and backfilled with 40mm clean angular stone. Drainage pipe to be laid to a nearby ditch approximately 10 metres from track. 4. Track Sub-Base Most of the material required for the track construction can be found on site. 5. Track Construction The track will consist of:- - Start ramp, rider waiting zone, no more than 2metres in height at a width of 2meters - 3 x 180 and 2 x 90-degree berms, 0.8m in height - 4 rhythm sections 1.8m riding width, consisting of x number of rollers - All berms to have entry and exit rollers - All berms have a rest platform and also a lower pavement to allow inexperienced riders to ride around the base of the berms on a more level surface. The track has approxima
Summary and deadlines come from the named official feed. Always confirm amendments, timezone, supplier eligibility, and submission requirements directly with the issuing organisation.
Original notice and documents
Browsing the original government notice and obtaining publicly available bidding documents from the issuing authority remain free. Some buyer portals require their own supplier registration.
- Issuing organisation
- Kingsteignton Town Council
- Official source
- UK Find a Tender
- Notice identifier
- ocds-h6vhtk-07b684
- Source document files verified for compilation
- Not yet available
Preview the ZIP tender briefing
The free sample ZIP includes a source-attributed notice summary, a bidding checklist and a source-link manifest. It does not contain the buyer's complete bidding attachments.
Download sample ZIPPack content is not official advice and is not a bid submission. Full document ZIPs are provided only when official files are verified, reusable and complete; paid checkout remains disabled until payment acceptance passes.