What is this opportunity?
The Authority is seeking a contractor to design and build a new 34 metre two span footbridge over the South Tyne River along Public Right of Way 302146, near the area known as Dryburn near Garrigill and in the Alston parish. The bridge will be required to be at 1.2 minimum walking width, with a pier design suitable for the frequent flash flooding that led to the previous footbridge failing. The PRoW forms part of the Pennine Way National Trail and the work will need to be carried out to National Trails Quality Standards. The bridge would sit within the Alston parish and nearby the remote village of Garrigill, a remote location within the North Pennines National Landscape. The project is to be let as a 2 stage Design and Build contract with the contractor being responsible for completion of a full design and obtaining all necessary consents, permits and orders (Stage 1) to allow construction works (Stage 2) to commence as soon as possible after 1st April 2028 (subject to funding), and where required making best use of the in-river working window of 16th June to 30th September.
Summary and deadlines come from the named official feed. Always confirm amendments, timezone, supplier eligibility, and submission requirements directly with the issuing organisation.
Original notice and documents
Browsing the original government notice and obtaining publicly available bidding documents from the issuing authority remain free. Some buyer portals require their own supplier registration.
- Issuing organisation
- Westmorland and Furness Council
- Official source
- UK Find a Tender
- Notice identifier
- ocds-h6vhtk-07bf89
- Source document files verified for compilation
- Not yet available
Preview the ZIP tender briefing
The free sample ZIP includes a source-attributed notice summary, a bidding checklist and a source-link manifest. It does not contain the buyer's complete bidding attachments.
Download sample ZIPPack content is not official advice and is not a bid submission. Full document ZIPs are provided only when official files are verified, reusable and complete; paid checkout remains disabled until payment acceptance passes.